Christmas in Action

On Saturday October 25th Spartanburg Water employees participated in Christmas in Action. This volunteer effort was very rewarding to all involved. The homeowner was very pleased with the work completed.
Our project consisted of the following:
- Demolish & remodel a kitchen by repairing water damage / holes in floor, replace kitchen flooring and sub-flooring, re-construct a kitchen island cabinet, install new vinyl floor covering, paint entire kitchen, trim work, and miscellaneous carpentry / repairs.
- Demolish and replace window in den
- Upgrade bathroom by installing safety rails in the bath/shower.
| |
|
Tip: The Top 13 on this page does only show the most viewed images of THIS directory.
|
|
 |
|
|